NIRMIO

Projects / Electrical / Electrical project 95

Pico Hydro Generator for a Stream or Pipe: Build and Test

Renewable EnergyMedium

Approx. component budget: Rs. 6,000 - 11,000

Objective

Measure the electrical output of a small hydro unit for different heads and flow rates.

What you will build

A small turbine (Pelton or cross-flow) with a generator, mounted on a pipe or water circuit with a pump, producing power for LED loads and battery charging.

Results you can expect

What you will learn

Hydro power basics, turbine design and small generators.

Tools and notes

PMDC or BLDC generator, 3D-printed or fabricated runner, flow meter, pressure gauge, charge controller. Keep electrical parts away from water and use a guarded set-up.

Resume points from this project

Replace [x] with your own measured results. Write only what you really did.

Rs. 99 project guide: prepared on request

The short guide for this project is prepared when you ask for it. Message us on WhatsApp and we will prepare it and tell you when it is ready.

Payment details are shared in the chat. We send the PDF on WhatsApp after your payment is confirmed.

More electrical projects

Back to all projects

Chat on WhatsApp