Electrical project 4: Automatic Power Factor Correction Panel (Capacitor Bank Switching)
Detect lagging power factor automatically and switch capacitor steps in to bring it close to unity, then measu...
View project and guideProjects / Electrical / Electrical project 90
Approx. component budget: Rs. 6,000 - 11,000
Automate the standby power sequence with safe timings and interlocks.
A controller that senses a mains failure, starts a generator (model) after a delay, transfers the load through an interlocked changeover, and returns to mains on recovery.
Sequencing, interlocks, standby power and safe transfer logic.
Contactors with mechanical interlock, voltage sensing, ESP32/PLC, a small petrol or DC motor as the generator model. Use isolation transformers, covers and supervision.
Replace [x] with your own measured results. Write only what you really did.
The short guide for this project is prepared when you ask for it. Message us on WhatsApp and we will prepare it and tell you when it is ready.
Payment details are shared in the chat. We send the PDF on WhatsApp after your payment is confirmed.
Detect lagging power factor automatically and switch capacitor steps in to bring it close to unity, then measu...
View project and guideBuild a digital overcurrent relay and check how well its trip times follow the standard IDMT curves for differ...
View project and guideBuild a residual current device model and measure its trip current and trip time for different leakage current...
View project and guide